

Architect

Contractor

Client
All of the ceilings, all of the columns, all of the gypsum plastered walls were done using ARRCOAT's range.
No changes in its color, no cracks, no moulds.
For the ceiling, the base provided was the rough concrete itself. We were asked to spray paint most of the ceiling.
30 Days.